Skip to main content


Each region implements procedures to ensure the adequacy of the grounds of protection and will periodically review the grounding system in each facility to determine the appropriate size, length, and number (if parallel grounds are required) of grounds protection. Regions must maintain and periodically update a list of maximum fault currents at each facility or location where Reclamation employees apply protection grounds.