The core value of AS/NZS 1579 lies in its systematic regulation of full-cycle pipe manufacturing process, from raw steel grade selection to finished pipe non-destructive inspection. It specifically mandates submerged arc welding as the core forming method for qualified large–diameter steel pipe and specifies detailed acceptance rules for every segment of high-pressure pipe welding procedure.



